JA12.3
Interconnection and Net Energy Metering Requirements
The
battery storage system and the associated components, including inverters, shall
comply with all applicable requirements specified in Rule 21 and Net Energy
Metering (NEM) rules as adopted by the California Public Utilities Commission
(CPUC).